Define the evidence needed before packing and shipment
A whole-home order can contain different rooms, configurations and finishes. The buyer needs a clear way to compare completed furniture with the approved project version before it is packed. This page is a buyer’s checking framework; it does not claim that every GEORGE project follows one fixed inspection frequency, tolerance, report format or third-party inspection arrangement.

Build the check from the approved schedule
The reference set should include the current room and item schedule, quantities, approved drawings, dimensions, finish or upholstery samples, hardware and agreed accessories. Each finished item needs an identifier that can be traced back to that set. If several similar rooms use different sizes or orientations, the identifier should preserve the difference.
- room, item code and quantity match the released project schedule;
- critical overall and interface dimensions match the approved record;
- visible material, colour, grain direction, upholstery and hardware match the accepted reference;
- doors, drawers, moving parts and agreed functions can be checked for the actual configuration;
- visible edges, joints, surfaces and alignment are recorded clearly; and
- loose accessories, installation parts, labels and instructions required by the order are accounted for.

Record differences instead of hiding them in a photo set
Ask how each difference will be logged, who decides whether it is acceptable, which corrective action is needed and what evidence closes it. A wide room view can show overall appearance, while dimensions, mechanisms and small finish differences may need close views or measured records. The required evidence should be agreed before completion so that it is practical to produce.
If independent inspection is important, state that requirement, scope, timing, access and cost in the project agreement. Do not assume an independent inspector, a fixed sampling plan or a guaranteed result merely because an inspection stage is discussed.
Keep release, packing and transport as separate decisions
Closing a visible difference does not answer how an item will be protected, labelled or transported. The agreed release should identify which items may move to packing and which remain open. Packing and delivery responsibilities belong in the delivery plan, including destination, access and installation interfaces.
In your brief, name the rooms and furniture that need priority checks, the critical dimensions or finishes, the evidence you expect and who may approve release. Discuss pre-shipment evidence for your whole-home furniture project.